PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing metal decking at Derrick -5 (4th Floor) Facing South-East (800x600).jpg Installed safety nets around Derrick -7 (2nd Floor) Facing South (800x600).jpg Poured concrete at Stairs -5 (2) Facing North (800x600).jpg Finished installing metal decking at Derricks 4-6 (4th Floor) Facing South-West  (800x600).jpg Started laying out gravel at the Servery Room 105 Facing North-East   (800x600).jpg Material for Stairs -2 Facing South (800x600).jpg
Previous pageNext page Poured concrete at Stairs -5 (2) Facing North (800x600)
Poured concrete at Stairs -5 (2) Facing North (800x600)